Task 06
SHC Task 06

Solar Systems Using Evacuated Collectors

Each Task 6 participating country was responsible for the design, construction, and monitoring of at least one solar energy system utilizing evacuated tubular collectors (ETC), a high performance collector. The eleven installations covered the full range of applications, a wide range of ETC designs, and a wide range of climatic regions, enabling significant comparisons to be drawn regarding collector and system performance.

Task Information

DURATION
June 1979June 1987
 

OPERATING AGENT

UNITED STATES OF AMERICA